Full-home renovations in Etobicoke, Mississauga and Toronto

Monty's plans and runs multi-room and whole-house renovations in Etobicoke, Mississauga and Toronto, from a kitchen and two bathrooms to a full house done in phases. Jonathan Montague walks the whole house before quoting and runs the job himself, so the order of work, the trades and your decisions stay in one place.

Etobicoke Mississauga Toronto

The houses that need more than one room done

Most full-home projects Monty's sees are in houses that haven't had a major update in decades. A 1950s Etobicoke bungalow may still have its first kitchen, one bathroom with coloured tile and a basement that was never finished. A Toronto semi built before 1930 has often been changed piece by piece, with a 1970s kitchen, a 1990s bathroom and wiring of several ages.

In Mississauga, 1970s and 1980s two-storeys often need the kitchen, all the bathrooms and the flooring done together, since they all date from when the house was built.

Some owners are getting a house ready to rent or sell. One example is the Etobicoke family home Monty's updated after 40 years without a renovation. In houses like these, planning the rooms together means the plumbing, wiring and floors get done once, in the right order.

Dining table under a statement chandelier beside the kitchen
Islington Village, EtobicokeFull-Home5 weeksSee this project

What a full home renovation with Monty's includes

Every job gets its own written scope, broken into phases, and anything excluded is named before you sign. Monty's runs the job, and licensed plumbers and electricians do the plumbing and electrical work. A larger job usually draws on most of this list.

Full home renovation choices and what each one means

A big renovation is a long list of decisions. These are the ones that shape the rest.

Full home renovation cost and timeline

A full-home renovation is priced from its own scope, phase by phase. Jonathan prices each house after walking it. These are the things that move the number most.

  1. How many rooms and trades

    A kitchen and two bathrooms need most trades for a few weeks. A whole house needs all of them for months, and more coordination.

  2. Structural and layout changes

    Removing bearing walls, moving bathrooms or adding a basement unit bring in engineers, permits and inspections.

  3. Hidden conditions

    Older houses can hide old wiring, galvanized pipes, a lead water line or rot. On a large job, some of this is likely, so the plan should allow for it.

  4. Finish level

    Across a whole house, small differences per room add up: the cabinet line, tile, fixtures, doors and trim.

  5. Phasing and living at home

    Working around a family means more setup, protection and cleanup each day. Moving out for the heaviest stretch can shorten the job.

  6. Access to the house

    A Toronto lot with no driveway, a bin that needs a street permit, or materials carried up to a third floor all add time.

Typical time on site

Typical time on site by scope
ScopeTime on site
Kitchen and two bathrooms together6 to 10 weeks
Main floor: kitchen, flooring and a powder room10 to 14 weeks
Several rooms across two floors2 to 4 months
Whole house, room by room4 to 6 months

Weeks count from the first day on site. Design, permits and order times for cabinets and tile come first. As a real example, Monty's refinished the kitchen, redid two bathrooms and set up a lower-level suite with a kitchenette in a 40-year-old Etobicoke family home in six weeks. Larger Toronto houses with structural work run toward the long end.

How a full home renovation runs, phase by phase

  1. Before work starts

    Whole-house walkthrough

    Jonathan walks every room with you, plus the basement, the panel and the plumbing. What he finds often sets the order of the work.

  2. Before work starts

    Phased scope and quote

    You get a written scope broken into phases: what's included, what isn't, pricing by phase and how long each should take. Monty's applies for the permits the work needs, and items with long lead times are sorted out here.

  3. Before each phase

    Selections and ordering

    Cabinets, tile, fixtures, doors and flooring are picked and ordered so each phase starts with materials on site instead of waiting on a delivery.

  4. First weeks of a phase

    Demolition and structure

    Protection goes up, the rooms in the phase are opened and anything hidden is shown to you. Structural work, such as a new beam, comes first.

  5. Middle weeks

    Rough-in and inspections

    Licensed plumbers and electricians rough in every room in the phase together, the ductwork goes in, then inspections happen before the walls close.

  6. Later weeks

    Rooms and finishes

    Drywall first, then kitchens and bathrooms, then flooring, stairs, trim and paint. The rooms you need back soonest are finished first.

  7. Final week

    Handover

    A room-by-room walkthrough with Jonathan, a list of any touch-ups, and a final clean before you move back into the rooms.

Full home renovations in Etobicoke, Mississauga and Toronto

Big jobs bring out the differences between the three cities, from permits to parking.

Renovation in Etobicoke

Etobicoke

Post-war bungalows and 1930s homes near The Kingsway are the most common full-home jobs. In one Alderwood bungalow that hadn't been renovated in 40 years, Monty's refinished the kitchen cabinets, redid two bathrooms and set up a lower-level suite with a kitchenette in six weeks so the owner could rent it out. Permits go through the City of Toronto.

Etobicoke renovations
Renovation in Mississauga

Mississauga

Two-storeys from the 1970s and 1980s in Erin Mills, Meadowvale and Streetsville often need the kitchen, bathrooms and floors at once. Some owners spread the work over a year or two and run plumbing for the later phase while floors are open. Permits come from the City of Mississauga.

Mississauga renovations
Renovation in Toronto

Toronto

Semis and row houses on narrow lots need a plan for parking, the bin and getting materials through the front door. Shared walls, heritage rules for exteriors on some streets and older wiring all affect the schedule.

Toronto renovations

What homeowners say after the dust settles

5.0 on Google, from 29 reviews
“Jonathan is very detail oriented and exacting. His work is impeccable and he leaves our home neat, clean and orderly after every day’s work.”
J. J. DayotHome renovation, Google review
“Monty helped us with our condo renos — floors, full bathroom, and full kitchen. We were very happy with the results.”
Nelkas KwemoCondo renovation
“The craftsmanship was excellent, everything was completed on time, and the price was very fair. I would definitely recommend Monty’s to anyone.”
Chantel JulienFlooring and finish carpentry
“Jonathan was absolutely amazing. He has always been upfront with his quotes and project timing. Highly recommend.”
Ria MicksHome renovation
“Jonathan showed a high level of integrity, reliability and real attention to detail. Choose Monty’s Renovations — you will be glad you did.”
Rick SchiralliCommercial renovation

Why homeowners hire Monty's for a full renovation

Jonathan runs every job
On a job with many trades, one person keeps it on track. Jonathan walks the house, writes the quote and runs the work through to handover.
A written scope by phase
You see what's included, what isn't, the price of each phase and the schedule in writing before anything starts.
Based in Etobicoke
Monty's works across Etobicoke, Mississauga and Toronto, so most jobs are a short drive from home base. Office hours are Monday to Friday, 9 AM to 6 PM.
5.0 from 29 Google reviews
Homeowners have given Monty's a 5.0 rating across 29 Google reviews.

Questions about full-home renovations

How much does a full home renovation cost?

It depends on how many rooms are involved, how much the layout changes, the finishes you choose and what the house hides. Doing several rooms together usually costs less than the same rooms one at a time over several years, because setup, demolition and trade visits are shared. Jonathan prices each house after walking it, and the written quote breaks the cost down by phase.

Can we live in the house during a full renovation?

Often, if the work is phased. The plan keeps one bathroom working and a temporary kitchen set up for as long as possible. If the whole main floor is being done, or water and power will be off for days, moving out for those weeks usually makes the job shorter and easier. Jonathan tells you which weeks will be the hardest before work starts.

Do we need permits for a whole-house renovation in Toronto or Mississauga?

Almost always for part of it. Bearing walls, new or moved plumbing, a basement unit and new entrances need building permits from the City of Toronto, which includes Etobicoke, or the City of Mississauga. New wiring needs an Electrical Safety Authority permit, which the licensed electrician files. Like-for-like finish work, such as new flooring or cabinets in the same spots, usually doesn't. Monty's applies for the building permits and builds permit time into the schedule.

In what order should the rooms be done?

Fix what's failing first: leaks, a wet basement or unsafe wiring. Then do the work that opens walls and floors, so plumbing and wiring go in once for the whole house. Kitchens and bathrooms come next. Flooring, stairs and paint go last so the new finishes aren't damaged by the work around them.

What do you usually find in an older house?

Knob-and-tube wiring in houses from before about 1950, galvanized water lines and cast iron drains. Some older Toronto houses still have a lead water line from the street. Sagging or notched joists and old plaster are common too, along with materials that need asbestos testing before demolition. Monty's shows you anything found, explains the options and confirms the price before carrying on.

Can a full home renovation be spread over a few years?

Yes. Plan the phases together so the first one doesn't get in the way of the next. For example, plumbing for a future basement bathroom can go in while the main floor is open, and the electrical panel can be sized for everything you plan to add later.

Do you renovate whole condos and townhouses?

Yes. A full condo renovation follows the building's rules on approvals, hours, elevator bookings, noise and flooring underlay. The plumbing and venting are tied to the building, so kitchens and bathrooms usually stay close to where they are. In a townhouse, the shared walls with the neighbours need the same care as in a semi.

Who runs the job day to day?

Jonathan Montague. He walks the house, writes the scope and the quote, and runs the work through to the final walkthrough. You have one person to call about the schedule, the trades and any decision that comes up.