Refinished white cabinets and quartz counter in a renovated kitchen in Etobicoke

Kitchen and bathroom renovation in Alderwood, Etobicoke

A family home, untouched for 40 years, updated to rent out

Location
Alderwood, Etobicoke
Home
1950s bungalow
Time on site
6 weeks
Scope
First update in 40 years, done to rent out

About this renovation job

The owner grew up in this Alderwood bungalow in Etobicoke, and nobody had renovated it in 40 years. The kitchen still had its original orange-brown wood cabinets. One bathroom had pale green wall tile, a green tub and a dark teal floor. He wanted the house updated so he could rent it out.

Monty's did the work in six weeks. The main kitchen kept its U-shaped layout and its original cabinets, which we refinished in white paint, with a white quartz counter and a subway-tile backsplash. The main-floor bathroom got a new tub with grey tile to the ceiling. The lower level became a separate suite for tenants, with a kitchenette in black cabinets and butcher block, and a glass shower bathroom.

Before and after

Kitchen

Original wood cabinets before the renovation in a kitchen in Etobicoke
Refinished white cabinets and quartz counter in a renovated kitchen in Etobicoke
BeforeAfter
Drag to compare.

Bathroom

Green tile and green tub before the renovation in a bathroom in EtobicokeBefore
Before: pale green wall tile, a green tub and dark teal floor tile.
Grey tile floor, new tub and oak vanity in a renovated bathroom in EtobicokeAfter
The main-floor bathroom after, with grey tile, a new tub and an oak vanity.
Peninsula and luxury vinyl plank floor in a renovated kitchen in Etobicoke
Wide view of the kitchen showing the peninsula and new luxury vinyl plank floor.

Why the owner wanted the family home rental-ready

This was the owner's family home. He grew up in it, and the house had not been renovated in about 40 years. Now he wanted to rent it out, and he knew the kitchen and bathrooms would turn tenants away.

The main kitchen worked, but it looked its age. The flat wood doors had turned orange-brown, with dark curved pulls and wood trim along the bulkhead. The counter was white laminate with a rounded edge. The backsplash was small square tile with dark grout, and the floor was worn through in the middle of the room.

The bathroom in the before photo was all green. Pale green square tile covered the walls, and the tub was green to match. The floor was dark teal tile. The caulk along the tub had cracked and turned yellow.

He asked for bright rooms with finishes that are easy to clean between tenants. He wanted the lower level set up as its own suite, so it could be rented apart from the main floor. He also wanted it done quickly, since an empty house earns no rent.

Black cabinets and butcher-block counter in a lower-level kitchenette in Etobicoke
The lower-level kitchenette with black cabinets, a butcher-block counter and white subway tile.

What turned up under 40 years of finishes

The main kitchen cabinet boxes were the good news. They were solid and still square after 40 years, so there was no reason to tear them out. That is why we refinished them instead of replacing them.

Once the green tile came off, the wall behind the tub was in poor shape. The tile had been set in a thick mortar bed, and pulling it took the old backing with it. We opened that wall to the studs and put up new cement board before any new tile went on.

The kitchen floor had worn through near the centre of the room. Under the old flooring, the subfloor had low spots. We levelled it before laying the new planks, so the floor won't flex and the plank joints stay tight.

The plumbing was original too. Our licensed plumber replaced the old supply lines and shut-off valves in both bathrooms and at both kitchen sinks, so a tenant won't be the first to find a leak. A licensed electrician put GFCI outlets beside the vanities.

Old fixtures and cabinets left holes in the drywall on the lower level. You can see one patch beside the kitchenette in the photo, before it was painted.

How it came together

The job took six weeks on site, with the crew moving between both kitchens and both bathrooms.

  1. Tear-out

    We cleared both kitchens and both bathrooms and covered the floors in the rest of the house. The green tub, green tile, old vanity and kitchen counter came out first.

  2. Repairs behind the walls

    With the rooms bare, we fixed what we found. That meant new supply lines and valves, a levelled kitchen subfloor and new cement board around the tub.

  3. Plumbing and electrical rough-in

    A licensed plumber set the new shower valves and the brackets for the handheld wands. A licensed electrician added pot lights in the bathrooms and updated the outlets.

  4. Bathroom tile

    The tub walls were tiled to the ceiling in large grey tile, laid flat in an offset pattern with thin light grout lines. The shower got the same style of tile on its back wall. Both floors got large grey tile in an offset pattern, running the long way down each room.

  5. Cabinet refinishing

    We took the doors off the original kitchen cabinets, filled the old pull holes and sanded every surface. The boxes, doors and bulkhead were then primed and painted white.

  6. Kitchen floors and counters

    Luxury vinyl plank went down in both kitchens. The main kitchen got a white quartz counter, a double stainless sink and white subway tile. In the lower-level kitchenette, black cabinets and a butcher-block counter went in under the window.

  7. Fixtures, glass and paint

    We set the oak vanities, toilets and matte black faucets, then hung the frameless shower glass. New baseboards went in, and the bathroom walls were painted white.

Frameless glass corner shower in a lower-level bathroom in Etobicoke
The lower-level bathroom with a frameless glass corner shower and large grey floor tile.
Matte black rain showerhead and handheld wand in a shower in Etobicoke
Inside the shower: square black rain head, handheld wand and grey porcelain wall tile.

The result

In six weeks the house went from 40 years out of date to ready for tenants. The main kitchen still works the way the family used it. The sink sits under the window and the peninsula is still there for prep, but the room is now white and bright instead of dark wood.

The lower level now works as its own suite, with a kitchenette and a shower bathroom, so the owner can rent it apart from the main floor. Both bathrooms have the same grey tile and black fixtures, so the two floors feel like one house. The surfaces wipe clean, and the white and grey finishes are simple to match if something gets damaged.

More from this job

Tub with matte black rain shower and grey tile in a bathroom in Etobicoke
New tub with a black rain showerhead, square spout and handheld on a bracket.
Large grey tile tub surround in a renovated bathroom in Etobicoke
Large grey porcelain tile runs from the tub to the ceiling on three walls.
Oak vanity with white top and black faucet in a bathroom in Etobicoke
Oak vanity with a white top, black faucet and three drawers beside the toilet.
Oak vanity with black bar pulls and undermount sink in a bathroom in Etobicoke
Close view of the oak vanity, black bar pulls and rectangular undermount sink.

The details

The finishes are bright and plain, so they are easy to clean and easy to patch between tenants. Most of what you see repeats from room to room.

What moves the price on a job like this

Every quote is written after Jonathan sees the house. These are the things that change the number most on a renovation job like this one.

  • Number of rooms and how much each room is being changed
  • Structural, plumbing, electrical, and layout complexity
  • Finish level across flooring, tile, trim, paint, and fixtures
  • Whether the work can be phased or needs to happen together
More about full-home renovations

Questions about a project like this

How long does it take to get an older house ready to rent?

This one took six weeks for two kitchens and two bathrooms. If a house hasn't been touched in decades, plan for some extra time. Old plumbing and uneven subfloors often need work once the rooms are open.

Should I paint my kitchen cabinets or replace them?

If the boxes are solid and the layout works, painting them saves time and money. In this house the sink stayed under the window and the peninsula stayed put. We filled the old pull holes, sanded and painted the cabinets white, and the new counter did the rest.

Which finishes hold up best in a rental?

Large tile has fewer grout lines to scrub. Luxury vinyl plank handles spills better than carpet. Plain white fronts are easy to touch up. Using one fixture finish through the house also makes replacements simple.

Can you work on several rooms at once?

Yes. Here the crew worked on both bathrooms and both kitchens in the same six weeks. Tile can go on in one bathroom while the plumber works in another room.

Want this priced for your home?

Jonathan Montague looks at every job in person before a quote is written. Tell him about the room, your timing and what you want to change.

Call or text

(647) 986-6298