Bathroom renovation in Etobicoke
Monty's renovates bathrooms in Etobicoke bungalows, split-levels, older Kingsway homes and lakeshore condos. A typical job is a full rebuild of one room, with the plumbing and fan brought up to date while the walls are open.
5.0 from 29 Google reviews Based in EtobicokeWhat an Etobicoke bathroom renovation usually involves
A lot of Etobicoke houses were built with one bathroom, and some still have just the one. It's often a small room with a tub, a window over it, and tile from when the house went up or from a quick update in the 1980s. When that room gets renovated, the family has to plan around losing it for a few weeks.
Monty's looks at the bathroom in person before quoting it. The visit covers what a photo can't show: whether the floor is soft near the toilet or tub, what the pipes are made of, whether there's a fan and where it vents, and how the window sits in the tub wall. Those details are why two bathrooms of the same size can be very different jobs.
The work follows a set order. Demolition comes first, then plumbing, framing and electrical changes, then a waterproof membrane on every wet wall and the shower floor. Tile goes on next, followed by the vanity, toilet, glass and fixtures, all picked before demolition so nothing waits on an order.
In one Etobicoke house that hadn't been renovated in 40 years, a green tub and green tile came out of one bathroom. Monty's replaced them with large grey tile, a new tub with a black rain showerhead and an oak vanity. The other bathroom got a frameless glass shower. Both bathrooms, the kitchen and a kitchenette were finished in six weeks.
Bathrooms in Etobicoke's main house types
The age and style of the house set the limits for the bathroom.
One main bathroom off the hall, usually with a tub under the window. The room is tight, so the work focuses on a better vanity, a recessed niche, and tile and fixtures that make it feel bigger. A window in the tub wall needs its own waterproofing plan, or a change to the shower layout.
The upstairs bathroom sits under the roof slope, so the ceiling drops on one side. The usual fix is to put the shower or tub under the high side and the toilet or vanity under the low side. Dormers and knee walls also limit where pipes can run.
Many have a main bath on the top level, a small two-piece off the primary bedroom, and a washroom by the lower family room. Renovating two at once saves on setup and trades. Turning the two-piece ensuite into a three-piece with a shower is a popular upgrade when there's room.
Original bathrooms here can have cast iron tubs, tile set in a thick mortar bed, plaster walls and a radiator. Demolition takes longer, and old cast iron or galvanized pipes usually get replaced while they're exposed.
Inside bathrooms with no window, so the fan does all the work. The drains connect to the building's stacks, which limits how far fixtures can move. The building may need to approve the work and book any water shut-offs.
What Monty's does in an Etobicoke bathroom
Taking the room down to the studs and building it back with new plumbing, waterproofing, tile and fixtures.
A tiled walk-in shower with a glass panel or door where the old tub used to be, with the drain and floor slope built for it.
A waterproof membrane on the shower walls, tub surround and shower floor before any tile goes on.
Floors, tub surrounds, shower walls, niches and benches, laid out so cuts land in sensible places and grout lines run straight.
Installing the vanity, toilet, faucets, mirror and lighting, using what you pick or with help choosing pieces that suit the room.
A fan sized for the room and vented the right way, so moisture leaves after a shower and doesn't end up in the walls or attic.
Bathroom renovation cost and timeline in Etobicoke
Monty's quotes each bathroom after a site visit. The size of the room matters less than most people expect. These are the things that move the cost.
What changes the price
Keeping the toilet, tub or shower and vanity where they are costs the least. Moving the toilet or shower drain means new drain lines, sometimes through the floor joists, plus more framing and floor work.
A tub with a tiled surround is simpler than a tiled walk-in shower with a sloped floor, a niche and a bench. Frameless glass is measured after the tile is done, and larger panels cost more.
Large tile, small mosaics, patterns like herringbone, and tile that runs to the ceiling all take more labour.
Rot under a leaking tub, a sagging subfloor or old cast iron drains all add work once they're found. Older Etobicoke houses are more likely to have them.
Many older bathrooms have no fan, or one that vents into the attic. A proper fan, new outlets near the sink, better lighting or floor heating all add to the electrical work.
Condo bathrooms may need building approval, booked water shut-offs and limited working hours, which can stretch the schedule.
Typical time on site
| Job | Typical time once work starts |
|---|---|
| Vanity, toilet and fixture refresh | 1 to 2 weeks |
| Tub-to-shower conversion | 2 to 4 weeks |
| Full rebuild, same layout | 3 to 5 weeks |
| Full rebuild with fixtures moved | 4 to 6 weeks |
| Condo bathroom | 3 to 6 weeks |
These ranges run from demolition to the final walkthrough. Tile, fixtures and glass should be chosen before work starts. If it's your only bathroom, Monty's plans which days the toilet and shower will be out of service so you can work around them.
Etobicoke neighbourhoods and their bathrooms
Here's what tends to come up in bathrooms across different parts of Etobicoke.
Older homes with cast iron tubs, plaster walls and radiators. Owners often want a modern bathroom with a look that still fits the house.
Bungalows and storey-and-a-halfs with a single main bathroom. Adding a second bathroom in the basement is a common way to ease the morning rush.
1960s split-levels with two or three bathrooms of the same age. Doing them together keeps the finishes matched and the disruption to one stretch of time.
Post-war houses in north Etobicoke with compact main baths. A tub-to-shower conversion or a better vanity layout gets the most out of the space.
Bungalows and storey-and-a-halfs with small hall bathrooms. Upstairs bathrooms under a sloped roof need a careful layout to keep standing room in the shower.
Former cottages and post-war homes near the lake. Plumbing here can be a mix from several decades, which is worth sorting out while the walls are open.
Compact brick houses and semis. Narrow bathrooms do well with a wall-hung vanity, a niche in place of a shelf, and a glass panel instead of a shower curtain.
Condo towers by the lake with windowless bathrooms. A quiet fan that moves enough air and fixtures that suit the existing drains come first.
Questions about bathroom renovations in Etobicoke
How long does a bathroom renovation take in an Etobicoke bungalow?
A full rebuild that keeps the toilet, tub or shower and vanity in the same spots usually takes 3 to 5 weeks from demolition to the final walkthrough. Moving fixtures adds a week or two. Older bungalows can turn up rot or old drains once the floor is open, which may add a few days.
How do we manage with only one bathroom in our Etobicoke house during the work?
Plan for a few weeks without a full bathroom. Some families stay with relatives for the worst stretch, and others use a basement washroom or rent a portable toilet for the driveway. Monty's plans the schedule to keep the toilet out of service for as few days as possible and tells you which days ahead of time.
Can Monty's replace the green or pink tub in an older Etobicoke bathroom?
Yes. Coloured tubs, toilets and tile from the 1950s to the 1970s still turn up in a lot of Etobicoke houses. On one recent job, Monty's took out a green tub and green tile and put in large grey tile, a new tub with a black rain showerhead and an oak vanity. Old steel and cast iron tubs are heavy, so removal is planned as part of demolition.
Is there room to add a second bathroom to my Etobicoke house?
Often there is. The easiest spots are close to the main drain stack, such as the basement under the existing bathroom, a large closet, or part of a bedroom beside the current bath. In side-splits, a two-piece ensuite can sometimes grow into a three-piece with a shower. Monty's finds the stack on the first visit to see what's practical.
Can the radiator stay in my bathroom in an older Kingsway home?
Yes, if you want to keep it. Many 1920s to 1940s Etobicoke homes heat with hot water radiators, and the bathroom one often sits under the window. It can stay, be swapped for a slimmer towel-rail style unit, or come out in favour of electric floor heating. Any change involves the heating system, so it's planned before demolition.
What can change in a Humber Bay Shores condo bathroom?
Most of what you see: tile, vanity, toilet, tub or shower, glass, lighting and the fan. Where the drains go is harder to change, since they connect to the building's stacks. Many buildings ask for approval before work, set quiet hours and need water shut-offs booked with management. Monty's gets those details from management at the start.
Can Monty's renovate an upstairs bathroom with a sloped ceiling in an Etobicoke storey-and-a-half?
Yes. The usual plan puts the shower or tub where the ceiling is highest and the toilet and vanity under the lower part, so you can stand comfortably where you need to. A skylight or dormer can add height and light, but it adds structural work. Pipe routes are tighter under a roof slope, so they're worked out before the layout is final.