Separate basement entrance on the Danforth, Toronto
A separate side entrance to the lower level
- The Danforth, Toronto
- Detached house
- 3 weeks
- Side entrance to the lower level
About this basement job
The owners of this detached house on the Danforth wanted the lower level to have its own door. Before, anyone going downstairs had to walk through the main floor. The side of the house already had a concrete landing and steps, set in the corner where the painted brick wall meets a section of blue-grey siding. Monty's built a small enclosed entrance on top of that landing.
The entrance has two new walls framed in wood and sheathed in OSB, with a low roof that sits under the existing overhang. It's sided in light grey vinyl with matching corner trim. A white insulated door with a large window faces the steps, and a small white window on the side lets in daylight. The job took about three weeks.
During the build and after
Side entrance
During
AfterA lower level with no door of its own
The owners live on the main and upper floors. They wanted the lower level to work on its own, for family and guests now, with the option to rent it out later. That meant a way in from outside that didn't run through their kitchen and front hall.
The house already had a side landing with concrete steps up to it, but it was open to the weather. Rain and snow landed right at the door. There was nowhere to stop out of the wind, kick off boots and find a key.
Closing in that landing made the most sense. The steps were already there, so the new entrance could stay small and sit where people already walked up to the house. The owners wanted it simple and tidy, with a window so the entry wouldn't be dark, and a door with glass that could still give them privacy at night.
Old concrete and two different walls to tie into
The framing photo shows what we started with. The concrete steps and landing are old, with worn edges and patched spots. Before any wood went down, we checked the landing for cracks and level. It was solid but not quite flat, so the bottom plates were shimmed to keep the walls straight. A plastic layer under the plates keeps the wood off the bare concrete.
The entrance also sits between two different walls. On one side is painted brick. On the other is blue-grey lap siding, with a shingled overhang above it. Brick is never perfectly flat, so the new wall had to be sealed where it meets the brick. On the siding side, the new roof had to slide in under the existing overhang without lifting the shingles.
A downspout runs down the brick right at the corner of the new wall, and a wall light hangs on the siding above the steps. Both stayed where they were. We framed around the downspout and kept the light working, since it's the only light over the steps at night.
How it came together
The entrance took about three weeks, from checking the landing to the last piece of siding.
Check the landing and plan the size
We measured the landing and set the new walls inside its edges, so the whole entrance sits on concrete. A new entrance like this usually needs a building permit in Toronto, and Monty's applies for it when the job needs one.
Frame the walls
Two new walls went up in wood studs, doubled at the corners. A header spans the top of the front wall, ready for the door. The house's own brick and siding close in the other sides.
Sheathe and cut the window opening
The side wall was covered in OSB panels. We cut an opening in it for a small window that faces the side path.
Build the roof
A low roof was framed over the top and fitted under the existing shingled overhang. The roof edge is wrapped in grey aluminum, so no bare wood shows.
Wrap, then set the door and window
The walls were wrapped against wind and water. Then the white insulated door went into the front opening and the window into the side wall, each flashed and sealed.
Siding and trim
Light grey vinyl siding went on both walls, with matching corner posts and trim around the door and window. The siding stops just above the concrete.
Hardware and clean-up
We fitted a handle set and a separate deadbolt, set the door threshold on the landing and cleaned the steps.

The result
The lower level now has its own front door. People staying downstairs can come and go without crossing the main floor, and the owners keep their own entrance to themselves.
The enclosure gives you a dry place to stand while you find your keys. The side window lets daylight into the entry, and the blind in the door glass closes for privacy at night. The existing wall light still shines on the steps. From the side path, the light grey siding looks like a small, neat addition beside the darker brick, and the old steps lead right up to the new door.
The details
Most of these finishes can be read straight from the photos. The new parts are a light grey, which sets the entrance apart from the darker blue-grey brick and siding of the house.
- Scope
- New enclosed entrance on an existing landing
- Main finishes
- Light grey vinyl siding, white insulated door, small white side window
- Framing
- Wood studs, doubled at the corners, with a header over the door opening
- Sheathing
- OSB panels on the walls, under the siding
- Siding
- Light grey horizontal vinyl siding with matching grey corner posts and trim
- Roof edge
- Low roof with the edge wrapped in grey aluminum, set under the existing shingled overhang
- Door
- White insulated steel door with a large window in the top half and a raised panel below
- Door glass
- A pleated blind sits inside the glass, so it can be closed for privacy
- Hardware
- Satin nickel handle set with a thumb latch, plus a separate keyed deadbolt
- Side window
- Small white vinyl window on the side wall, facing the side path
- Steps
- Existing concrete landing and steps, kept as they were
- Checked the existing concrete landing
- Framed two new walls with a header over the door
- Sheathed the walls in OSB
- Framed the side window opening
- Built a low roof under the existing overhang
- Wrapped the roof edge in grey aluminum
- Wrapped the walls and flashed the door and window
- Installed a white insulated steel door with a half-glass window
- Installed a small white side window
- Fitted a handle set and deadbolt
- Sided the walls in light grey vinyl with corner posts and trim
- Sealed the new walls to the brick and siding
- Kept the existing steps, downspout and wall light
| Phase | Time |
|---|---|
| Checking the landing and framing | 1 week |
| Roof, sheathing and wrap | 4 days |
| Door and window | 2 days |
| Siding, trim and hardware | 1 week |
| Total time on site | 3 weeks |
What moves the price on a job like this
Every quote is written after Jonathan sees the house. These are the things that change the number most on a basement job like this one.
- Moisture prep, framing, insulation, and drywall scope
- Bathroom additions, egress needs, or layout changes
- Flooring choice and subfloor condition
- Electrical, lighting, storage, and ceiling detail choices
Questions about a project like this
Do I need a permit for a separate basement entrance in Toronto?
Usually, yes. A new entrance that adds to the outside of the house most often needs a building permit from the City of Toronto. The rules depend on the house and how the lower level is used, so we check your job before any work starts and apply for the permit when it needs one.
Can you build an entrance on my existing steps?
Often, if the concrete is solid. On this job, the enclosure sits on the landing that was already there. We check for cracks and level first. If the concrete is badly broken, it has to be fixed or replaced before framing.
Does the new siding have to match the house?
No. Here the entrance is a lighter grey than the painted brick and siding, and it still looks tidy. We can match your house colour or go lighter or darker.
How long does a side entrance like this take?
This one took about three weeks. Permit timing, weather and how long the door takes to arrive can all add time.